Pro Dirt Works LLC

Utility Trenching in Tuscarawas County, OH

Trenches for water lines and electric conduit, dug carefully around the utilities and buildings already there. Backfilled and cleaned up once the line is in.

Narrow trench dug along the side of a metal building

Utility trenching is digging a narrow trench to a set depth so water lines, electric conduit or other service lines can run underground, then backfilling it once the line is in.

Need a trench for a water line or electric conduit around Sugarcreek or Tuscarawas County? Pro Dirt Works digs it. We notify Ohio811 at least two working days before digging and work carefully around existing lines and structures. When the line is in, we backfill and clean up. Your licensed plumber or electrician makes the connections.

Trenches Dug Carefully, Backfilled Clean

A new water line to the barn starts with a trench. So does power out to a shed or shop. The digging sounds simple, but it's easy to do damage if you're careless. Gas, electric, phone, cable and water lines may already be in the ground, plus private lines nobody remembers putting in. Pro Dirt Works does utility trenching around Tuscarawas County. We dig carefully around existing utilities and structures, to the depth and on the route your trades need. Our part is the digging and the backfill. Your licensed plumber or electrician, or the utility company, makes the connections. Each part of the job goes to the people who should be doing it.

Open trench beside a metal building with a survey rod nearby

Every trench starts with Ohio811, the state's call-before-you-dig center. Ohio law requires the person doing the digging to notify Ohio811 before excavation starts. That includes digging by hand. Notice has to go in at least two working days ahead, not counting the day of the notice, weekends or legal holidays, and no more than 16 calendar days before digging starts. You can dial 811 or file a notice online. On your trench, we're the ones digging, so we place the notice and wait for the lines to be marked. Ohio811 also tells homeowners to confirm a notice was placed before work starts on their property. Ask us for the ticket number and we'll give it to you. Nothing gets dug until the marks are in.

811 doesn't mark private lines, and that surprises a lot of people. Ohio811 says privately owned lines are the homeowner's responsibility. Think of the water line you or a past owner ran to the barn, or buried power out to a garage or a yard light. A line to a propane tank can fall in the same bucket. If there might be private lines near the trench route, tell us what you know. It may be worth hiring a private locating company to mark them before we dig. Once lines are marked, Ohio811 treats the area within 18 inches on either side of a marked line, plus the width of the line itself, as the tolerance zone. Inside that zone we slow way down. Going slow costs a little time. Hitting a line costs a lot more.

Depth and route come from your trades and the codes they work under. A water line has to be deep enough to stay below the frost. Electric conduit has its own depth rules, depending on what's being run. Your plumber or electrician tells us the depth, and we dig to it with a clean, straight trench and a flat bottom so the line sits evenly. We plan the route to stay clear of foundations, septic systems, trees and other lines where we can. We also decide ahead of time where the spoil piles go, so we don't tear up more yard than we need to. Near a building or another utility, we take it slow. A careful trench now beats a dig-up and a repair bill later.

Once the line is in and your trade or the inspector has signed off, we backfill. How we do it depends on the line. Some lines need sand or fine material around them first so rocks don't damage the pipe or conduit. Your trade will tell us what they want. Then the trench gets filled and packed in layers, so it doesn't sink into a ditch the first time it rains. We grade the top back to match the yard and leave it ready for you or your landscaper to seed. Trench crosses a gravel drive? We can rebuild the stone so you can drive on it again. And if the trench settles, or anything else is wrong with our work, we're back within one business day to make it right.

Common Uses for Utility Trenching

  • ✓Water line to a barn, shop or new home
  • ✓Electric conduit to a shed, garage or outbuilding
  • ✓Service line trenches for a new build
  • ✓Trenching across a yard with existing utilities
  • ✓Trenches near foundations, driveways and landscaping

Why Choose Utility Trenching

Utilities marked before we dig

We place the Ohio811 notice and wait for the marks before the trench starts.

Slow near the marks

Near marked lines, foundations and buildings, we slow down. No digging blind.

Clean backfill

Packed in layers and graded back, so the trench doesn't turn into a ditch.

Back within one business day

Trench settled, or something else wrong with our work? We come back within one business day to make it right.

Our Utility Trenching Process

1

Call or text (330) 988-4342. Tell us what line is going in, where it starts and ends, and how deep your plumber or electrician wants it.

2

We walk the route with you and ask about private lines. Then you get a free estimate.

3

We notify Ohio811 at least two working days ahead and wait for the marks.

4

We dig the trench to depth and go slow near marked lines and structures.

5

Your trade lays and connects the line. Then we backfill, pack and grade the trench, and clean up.

Utility Trenching Pricing

Length, depth and the soil come first. A long trench through rock or around existing lines takes more time than a short one in easy soil. Access, crossing a driveway or landscaping, and the backfill material your line needs all play a part too. Text a few photos to (330) 988-4342 and we can often send a rough price range the same day. Estimates are free.

Utility Trenching FAQ

Common questions about utility trenching in Tuscarawas County and East-Central Ohio.

Yes. Ohio law requires whoever is doing the digging to notify Ohio811 first, even if it's hand digging. Notice is due at least two working days before you dig, not counting the day of notice, weekends or legal holidays. It can't go in more than 16 calendar days ahead. When we're digging your trench, we place the notice.

Usually not. Ohio811 says privately owned lines are the homeowner's responsibility. Power you ran to the garage, or water a past owner ran to the barn, generally won't get marked. Tell us what you know about those lines. A private locating company can mark them before we dig.

No. We dig and backfill. Your licensed plumber or electrician, or the utility, makes the connections and handles any inspections their work needs. We line up depth and timing with them so the trench is ready when they are.

It depends on what's going in. Water lines need to be below the frost line. Electric conduit depth depends on the type of wiring and conduit. Your plumber, electrician or utility sets the depth, and we dig to it. If you don't know yet, ask them before we schedule.

A short, shallow trench in easy soil is one thing. A long one through rock, around existing lines, is another. Access matters too, along with whether we cross a driveway or landscaping and what backfill material the line needs. Send photos and a rough route for a ballpark range, or set up a free estimate.

It's the area within 18 inches on either side of a marked utility line, plus the width of the line itself. Digging inside that zone takes extra care. We slow down near the marks so nothing gets hit.

Last updated

Ready for Utility Trenching?

Get a free, no-obligation estimate for your utility trenching project.

Serving Tuscarawas County and East-Central Ohio · Mon-Sat 8am-5pm

Call NowGet My Free Estimate